
Bathroom Remodeling
Your guide to bathroom remodeling services.

Why Homeowners Remodel Their Bathrooms
Services Offered
Services
Bathroom Remodeling Service Types
Cost Guide
Bathroom Remodel Cost: What to Budget in 2026
Cosmetic Refresh
New paint, vanity hardware, mirror, light fixtures, and accessories. Refresh the look without touching plumbing or tile. Great for sellers preparing a home for market or homeowners on a strict budget. Most cosmetic refreshes finish in 1–2 weeks.
Mid-Range Bathroom Remodel
New vanity, fixtures, tile floor,and a tub-to-showerconversion or showerupgrade. The most popularscope for primaryresidences. Strong ROI atresale and typically takes 3–5weeks from demolition tofinal inspection.
Full Bathroom Renovation
Complete gut and rebuildincluding plumbingrelocation, layout changes,custom vanity, premium tile,heated floors, and aframeless glass shower.Includes permits andinspections. Plan for 6–10weeks of active work.
Master Suite & Spa
Master bathroomexpansions, freestandingsoaking tubs, custom steamshowers, double vanities,and luxury fixtures. Commonin upscale homes andprimary suite additions.Typically includes structuralchanges and high-endfinishes throughout.
Timeline
Bathroom Remodel Timeline: What to Expect
Planning & Material Selection (1–3 weeks)
Finalize the layout, select tile and fixtures, choose a vanity and countertop, and order materials. Custom vanities and specialty tile have the longest lead times. Don't start demo until materials are on-site, this is the #1 cause of bathroom remodel delays.
Demolition (1–2 days)
Old tile, vanity, tub or shower, and fixtures are removed. The space is taken down to studs if doing a full remodel. Expect dust and the loss of bathroom use for the entire project. Plan for an alternative bathroom (guest bath, RV, neighbor) for the duration.
Rough-In: Plumbing & Electrical (3–5 days)
Plumbing rough-in for new fixtures (and any relocations), electrical updates for lighting, GFCI outlets, and exhaust fan, and any HVAC work. Includes drywall and waterproofing membrane installation. Rough-in inspection happens at the end of this phase.
Tile, Vanity & Shower (2–4 weeks)
Floor and wall tile installation (the longest single phase), shower pan and glass install, vanity placement, and countertop install. Tile takes time, plan for a few days per surface. Grout cures overnight, sealer applied a day later.
Fixtures, Finishes & Punch List (3–5 days)
Faucets, showerheads, toilet, mirror, lighting, and hardware all installed. Paint touch-ups, caulking around the tub and vanity, and a final punch list to address any small issues. Final inspection, then your new bathroom is ready.
Design Ideas
Popular Bathroom Design Styles

glass showers, neutral stone tile, heated
floors, and warm wood vanities. Designed
to feel like a luxury hotel bathroom. The
most popular master bath style of the
decade.

format porcelain tile, hidden storage, and
clean monochrome palettes. Black
hardware and matte finishes. The choice
for new construction and contemporary
remodels.

hardware, double pedestal sinks or
shaker vanities, and warm wood floors.
Pairs well with apron-front sinks and
matte black or brushed brass fixtures.

marble-look countertops, classic subway
or hexagonal tile, polished chrome or
nickel fixtures, and decorative molding.
Timeless and resale-friendly.

brushed nickel or polished chrome, and
natural textures. Often paired with rope-
and-driftwood accents. Popular in coastal
markets but works anywhere.

fixtures, exposed pipe shelving, dark
vanity finishes, and oversized subway or
penny tile. Best for loft conversions and
urban remodels.
Materials Guide
Choosing Bathroom Materials That Last
Bathroom Remodel FAQs
Resources
Related Bathroom Remodeling Guides
Built for homeowners


.png)