← Back to Guides
Ultimate Guide

Cabinet Refacing vs New Cabinets: Which Option Fits Your Project?

12 min read·Remodly

One of the biggest decisions in a kitchen remodel: keep the boxes and reface, or replace cabinets entirely. This guide breaks down when each option makes sense.

Key Takeaways

  • Refacing saves 30–50% versus full replacement.
  • Refacing only works if existing boxes are structurally sound.
  • Full replacement makes sense if you want layout changes or new sizes.
  • Both options can be completed in 1–2 weeks.

Cost Ranges

When Refacing Wins

If your existing cabinets are well-built (plywood boxes, no water damage), refacing delivers a new look at a fraction of the cost.

When Replacement Wins

Replace if you want different sizes, layouts, soft-close drawers, or if existing boxes are damaged or particleboard.

Cost Comparison

Refacing a typical kitchen: $4,000–$10,000. Full replacement: $8,000–$25,000+.

Project Timeline

Bound to project-timeline rich text field.

Material Comparison

Bound to material-comparison rich text field.

Full Guide

Bound to body-content rich text field.

Frequently Asked Questions

Bound to faq-block rich text field.

How long does cabinet refacing take?

Typically 3–5 days.

Can refacing match any modern style?

Yes. Door styles, finishes, and hardware fully customize the look.

Ready to Start Your Project?

Discover trusted partners in your area, fast and free.

Find My Pro →