What Is Included in a General Remodeling Project?
General remodeling projects cover multiple rooms or systems at once and are managed by a general contractor who coordinates every trade. Here's what's typically included and what to expect.
Key Takeaways
- General remodels touch 2+ rooms or trades.
- The GC handles permits, scheduling, and trade subcontractors.
- Budget 10–15% contingency for unexpected discoveries.
- Timelines run 2–6 months for multi-room work; 6–12 months for whole-home.
Cost Ranges
What a GC Does
A general contractor coordinates plumbers, electricians, framers, drywall, tile, paint, and inspections. You have one point of contact, not five.
What's Typically Included
Permits, dumpster, demo, framing changes, trade work, finishes, cleanup, and final inspections. Confirm what's in the scope before signing.
What's Often Excluded
High-end finishes (often allowance-based), upgraded fixtures, design consulting, and any work outside the original scope.
Project Timeline
Material Comparison
Full Guide
Frequently Asked Questions
Do I need a GC?
Yes for projects touching 2+ trades or requiring permits.
How much markup does a GC add?
Typically 10–20% over direct trade costs.